An acid base indicator has Ka=3×10-5. The acid form of the indicator is red and the basic form is blue. By how much must the pH change in order to change the indicator from 75% red to 75% blue (log 3=0.4770)

1. 0.95

2. 2.3

3. 0.75

4. 5

Subtopic:  Buffer |
 50%
Level 3: 35%-60%
Hints

The dissociation constants for aniline, acetic acid and ionic product of water at 25°C are 3.83×10-10,1.75×10-5and1.008×10-14 respectively. The degree of hydrolysis of aniline acetate in a decinormal solution is

1. 0.56%

2. 55%

3. 5.6%

4. 2.75%

 

Subtopic:  Salt Hydrolysis & Titration |
 59%
Level 3: 35%-60%
Hints

A solution of benzoic acid (a weak monobasic acid) is titrated with NaOH. The pH of the solution is 4.2 when half of the acid is neutralized. The dissociation constant of the acid will be:

1. 3.2×10-5

2. 6.42×10-4

3. 6.31×10-5

4. 8.7×10-8

Subtopic:  Buffer |
 60%
Level 2: 60%+
Hints
Links

advertisementadvertisement

The mixture that shows the maximum buffer capacity is:

1. 0.1MCH3COOH+0.2MCH3COONa

2. 0.1MCH3COOH+0.15MCH3COONa

3. 0.05MCH3COOH+0.15MCH3COONa

4. 0.1MCH3COOH+0.12MCH3COONa

Subtopic:  Buffer |
Level 3: 35%-60%
Hints

The pH of a solution containing 0.1 mol of CH3COOH, 0.2 mol of CH3COONa, and 0.05 mol of NaOH in 1 L of solution is-

(pKa of CH3COOH=4.74 and log 5=0.7)

1. 4.56

2. 5.44

3. 5.04

4. 3.74

Subtopic:  Buffer |
 58%
Level 3: 35%-60%
Hints
Links

18 ml of mixture of acetic acid and sodium acetate required 6 ml of 0.1 M NaOH for neutralization of the acid and 12 ml of 0.1 M HCl for reaction with salt separately. If pKa of the acid is 4.75, what is the pH of the mixture?

1. 5.05

2. 4.75

3. 4.5

4. 4.6

Subtopic:  pH calculation |
 54%
Level 3: 35%-60%
Hints

advertisementadvertisement

What is the minimum pH required to prevent the precipitation of ZnS in a solution that is 0.01 M ZnCl2 and saturated with 0.10 M H2S?

[Given:KspofZnS=10-21,Ka1×Ka2ofH2S=10-20]

1. 4

2. 3

3. 2

4. 1

Subtopic:  Solubility Product |
Level 3: 35%-60%
Hints

Which of the following is an amphiprotic (can accept and give protons) ion?

1. HPO3-

2. H2PO2-

3. H3PO4

4. H2PO4-

Subtopic:  Ionisation Constant of Acid, Base & Salt |
 58%
Level 3: 35%-60%
Hints

The ratio of F- and HCOO- in a mixture of 0.1 M HF (Ka=6.6×10-4) and 0.2 M HCOOH (Ka=2×10-4)is:

1. 2 : 2.3 2. 1 : 3.3
3. 3.3 : 2 4. 3.3 : 1
Subtopic:  Ionisation Constant of Acid, Base & Salt |
 60%
Level 2: 60%+
Hints

advertisementadvertisement

A buffer solution is prepared by mixing 10 mL of 1.0 M acetic acid with 20 mL of 0.5 M sodium acetate which is then diluted
to 100 mL with distilled water. If the pKa of CH3COOH is 4.76, the pH of the buffer solution prepared is -
1. 5.21

2. 4.76

3. 4.34

4. 5.35

Subtopic:  Buffer |
 73%
Level 2: 60%+
Hints